20
August 2006
Poles Removed from the Road to start the Metro work |
20
August 2006
Removed Poles lying at the side of the road. |
|
 |
 |
 |
21
April 2007
This machine is used to dig in hole in the ground for
erecting the pillar on which the whole Metro Bridge structure
will rest. |
21
April 2007
Digging in Action |
21
April 2007
Underground pillar in construction. See the amount
of steel for the Pillar construction. In the background
is Nirula's at Sector 2 Noida. |
 |
 |
 |
21
April 2007
Underground Pillar is complete and now preparation
being done for constructing the rest of the pillar. This
orange structure is placed around the steel and is water
tight. In this concrete is put from the top and left to
get set. On removing the yellow structure the pillar looks
as shown in the next picture. |
21
April 2007
Over-ground pillar is complete in this, now structure
on top the pillar is being constructed on which the prefabricated
Top will be placed. |
21
April 2007
Noida Metro Construction |
 |
 |
 |
21
April 2007
One of the very first Noida Metro Top Surface being
prepared to be put on the pillars. The top surface is
prefabricated at different location and then put on the
pillars using crane. This way both Pillar as well as the
Top Surface construction can be done conveniently in parallel
saving a lot of time. |
21
April 2007
Preparing for placing the Top on the pillars. |
21
April 2007
Placing the Top |
 |
 |
 |
2
May 2008
Erected pillars at Gol Chakkar |
17 May 2008
Completed top opposite Sector 2. Electrical wiring and laying of tracks is in progress. |
8 September 2008
Completed top on Gol Chakkar
|
|
 |
 |
25
July 2009
Trial run on Noida route |
25
July 2009
Trial run on Noida route |
25
July 2009
Trial run on Noida route |
More Photos will come soon...